christmas2010_banner
Permalink Gallery

Seasonal Snow Game (web mini-game)

Seasonal Snow Game (web mini-game)

Whilst working at FusedWorks we were often short of time, putting our every spare minute or hour into improving the quality or functionality of a project/brief, so for the last two winter breaks whilst working there I personally felt that we had missed or not taken advantage of the promotional opportunity to send our existing clients and friends a little thanks through a seasonal fun web-based game.

Having previously developed a character and scenario, I took advantage during a couple of nights of my winter holiday to complete my vision, fortunately just in time for the morning of the 25th of December 2011. The game although by no means polished took the equivalent of 3-5 Days to complete, it conveys my original ideas and concepts well although I would have liked to spend another couple of weeks tweaking and adding extra detail.

Supported Platforms : Web

building_engineering_banner
Permalink Gallery

Building Services Engineering (Yhelln)

Building Services Engineering (Yhelln)

When approached in June 2009 to create an educational learning application that would help building services engineering students grasp the basic concepts of domestic electric/gas supply, heating systems, control systems and sound reflectance/ absorbtion I knew I was in for an intense time of programming.

With the aim of meeting five learning objectives from the foundation degree in building services at Grimsby college, the client team and I decided upon showing as many of the concepts in one environment as possible. The piece was built as both a standalone application and a web-ready version so that both lecturers and students could explorer the concepts as a group or in their own time, the piece could also be viewed in either 2d or in a 3d stereoscopic format should the facilities be available.

The piece allows the user to:- look at the construction of an underfloor heating system; look at the different properties of an insulated external wall construction; examine the parts of a combi-condensing boiler, see the condensing and heat transfer take place, examine the flow of hot water through both underfloor and radiator based heating systems; examine electrical supply, fuseboxes and different circuits and much more.

The hardest part of the project was modelling the boiler internals and showing the flow of heat from the boiler, but after 12-14 weeks of work all was complete and the project deemed a success in terms of conveying some of the more difficult to understand concepts to the students in a simpler and clearer manner.

Supported Platforms : Windows, Mac OS, Web